Complete refurbishment of industrial unit to include; Strip out of existing offices, toilets and kitchen and supply and fix new, to include M&E, plastering, decorations, tiling, carpet, tiles and vinyl floor coverings.
Installation of Fire Alarm system to offices and Warehouse areas, together with emergency lighting throughout. Spray apply asbestos encapsulation paint to underside of warehouse roof and apply factory wall paint to blockwork walls.
Overhaul existing roller shutter doors and spray paint.
Shot-blast warehouse slab and apply resin. External cladding to front elevation, together with new powder coated entrance door and windows. New steel insulated fire exit doors and frames.
New concrete hardstanding, block paving, asphalt and car parking line marking.
New palisade fence and gate to perimeter.

  • Client: Unilever (UK) Pension Trust Fund Trustees c/o CBRE Investors Ltd
  • Administrator: Malcolm Hollis